Employed by the EPC contractor, to deliver concrete from concrete mixer trucks to the site with latest Putzmeister 1407 concrete pump using around 76 meters pipe, we filled the foundation at 50 cubic meter per hour. A total of 500 man-hour was dedicated, despite the monsoon season.